Pumped System Installation

Pumped System Installation

  1. Prepare disposal site as described in the appropriate system configuration as listed above.
  2. Provide a well-anchored distribution box with a velocity reduction tee or baffle. Set distribution box to elevation according to state or local regulations.
  3. Set pump chamber floats or control panel to deliver a maximum of 4 gallons per B43 module per dosing cycle, or 3 gallons per A42 module per dosing cycle.
  4. GSF system assembly is the same as for gravity designs in the appropriate system configuration as listed above.
  5. For pressure distribution systems, please contact Eljen Corporation’s Technical Resource Department for additional information on design and installation guidelines at 1-800-444-1359.